Ibratjon Aliyev – Scientific research and development of solar energy in the modern world and the Republic of Uzbekistan. Monograph (страница 6)
prolongation for a period of 3 years of loans from the Fund for Reconstruction and Development of the Republic of Uzbekistan issued for co-financing projects of Uzbekenergo JSC, with a corresponding extension of the terms of final payments and restructuring of obligations of refinancing banks according to Appendix No. 4;
The reissue of a previously issued loan from Uzbekenergo JSC to Uzbekhydroenergo JSC to finance the investment project "Modernization of Charvak hydroelectric power plant hydro generators with replacement of impellers".
The Ministry of Finance of the Republic of Uzbekistan should make changes to the previously issued state guarantees for the obligations of Uzbekenergo JSC arising from this resolution.
11. The Ministry of Higher and Secondary Special Education, together with the Ministry of Foreign Affairs of the Republic of Uzbekistan, JSC "Uzbekenergo" and JSC "Uzbekhydroenergo", within two months, submit proposals to the Cabinet of Ministers on the establishment of a branch of the Federal State Budgetary Educational Institution of Higher Education "National Research University "MEI" (Russian Federation) in the republic.
12. To the Cabinet of Ministers of the Republic of Uzbekistan:
take measures to attract organizations that are professionally engaged in recruitment to hire highly qualified managers in the energy industry;
Together with the Prosecutor General's Office, within a month, to submit to the Legislative Chamber of the Oliy Majlis of the Republic of Uzbekistan a draft law providing, inter alia, for improving the procedures for connecting alternative electricity producers to the unified energy system and implementing projects on the terms of public-private partnership.
13. JSC "Uzbekenergo" together with the Ministry of Justice of the Republic of Uzbekistan and other interested departments:
by April 1, 2019, to develop and submit for approval to the Cabinet of Ministers of the Republic of Uzbekistan regulations for connection to the unified energy system of business entities producing electric energy, including from alternative energy sources;
Within two months, submit proposals to the Cabinet of Ministers of the Republic of Uzbekistan on amendments and additions to the legislation arising from this resolution.
14. Control over the implementation of this resolution shall be entrusted to the Prime Minister of the Republic of Uzbekistan A. N. Aripov, Head of the Presidential Administration of the Republic of Uzbekistan Z. Sh. Nizomiddinov and Deputy Prime Minister of the Republic of Uzbekistan A. S. Sultanov.
1.3. Decree of the President of the Republic of Uzbekistan «On approval of the strategy of modernization, accelerated and innovative development of the construction industry of the Republic of Uzbekistan for 2021—2025» under the number UP-6119 dated 11/27/2020
In order to further improve the construction industry, to form mechanisms for the consistent development of architecture and construction bodies and institutions, to ensure the effectiveness of the public administration system, progressive introduction into the field of digital technologies:
1. To determine the main directions of modernization, accelerated and innovative development of the construction industry of the Republic of Uzbekistan:
urban development of territories and ensuring effective public participation in this process;
improving the quality and safety of urban development activities;
ensuring the efficiency, rationality and transparency of administrative procedures in the field of urban development, as well as improving the efficiency of organizations in the construction industry;
digitalization of urban planning activities, introduction of modern information and communication technologies into the industry;
improvement of the system of training, retraining and advanced training of personnel, development of scientific potential in the field of urban planning.
2. Approve:
Strategy of modernization, accelerated and innovative development of the construction industry of the Republic of Uzbekistan 2021-2025 (hereinafter referred to as the Strategy) according to Appendix No. 1;
The Roadmap for the implementation in 2021-2025 of the Strategy for Modernization, accelerated and innovative Development of the construction industry of the Republic of Uzbekistan in accordance with Appendix No. 2.
3. Set targets for the implementation of the Strategy of Modernization, accelerated and innovative development of the construction industry of the Republic of Uzbekistan for 2021-2025 in accordance with Annex No. 3, providing:
improving the position of the Republic of Uzbekistan in the international index "Doing Business" (Doing Business Index) in the direction of "obtaining construction permits" (Dealing with Construction Permits) from the current 61.7 points to 78.2 points by the end of 2025;
achieving by 2025 the harmonization of national urban planning norms and rules with international norms and standards at a level of at least 50 percent, taking into account geological, climatic, seismological and other features of the Republic of Uzbekistan;
achieving coverage of all cities and 25 percent of urban settlements with master plans by 2025;
ensuring by 2025 the creation of an additional four electronic platforms within the framework of the National Information System "Transparent Construction", as well as their integration with interdepartmental information systems and databases;
achieving by 2025 the share of the introduction of the "volumetric" method of development of design and estimate documentation up to 50 percent of the total number of construction projects in the republic;
By 2025, one of the higher educational institutions in the field of architecture and construction will be included in the list of the best higher educational institutions in Asia (top 1000) in the ratings of internationally recognized organizations.
4. Establish the procedure according to which, from January 1, 2021, in order to ensure public control over construction:
a) general plans of settlements are approved taking into account the results of public discussion. At the same time , public discussion of the general plans of settlements is carried out in the following order:
Stage I – familiarization of citizens with the terms, place and procedure of public discussion;
Stage II – conducting public discussion (discussions, social surveys, collecting opinions of residents, land users and owners of real estate and other methods) on the draft general plan of the settlement;
Stage III – analysis of public opinion based on fixed results of public discussion;
Stage IV – informing the public about the results of public discussion in the media, including on the Internet;
b) the possibility of carrying out a public examination of the master plans of settlements for compliance with the rights and legitimate interests of legal entities and individuals, the interests of society and the state is being introduced;
c) a mechanism is being introduced for developing an alternative general plan of a settlement or making changes (adjustments) to it at the initiative of subjects of public control who do not agree with the proposed general plan of a settlement;
d) the organization of public discussion of the draft general plans of settlements is entrusted to the local public authorities.
5. Establish that from March 1, 2021:
a) the construction and reconstruction of buildings and structures, including individual residential buildings, with a number of floors of more than two floors (excluding the ground floor), a height of more than 12 meters from the ground surface and (or) a total area of more than 500 square meters are carried out with the mandatory examination of the project documentation of the object and the establishment of state construction control of the object by territorial inspections on control in the field of construction under the Ministry of Construction;
b) it is prohibited:
developers – individuals and legal entities, with the exception of organizations engaged in construction and installation work as the main activity, independently (by economic means), without concluding a construction contract with a construction organization, to carry out the construction and reconstruction of buildings and structures with more than two floors (excluding the ground floor), a height of more than 12 meters from the surface of the earth and (or) a total area of more than 500 square meters;
implementation of the construction of multi-storey apartment buildings on land plots located in the functional zones of the territories of settlements not intended for this type of construction;
increase in the number of storeys (superstructure) of existing buildings and structures, including individual housing, without examination of project documentation;
increase in the number of storeys of buildings and structures under construction (by changing the project documentation) without carrying out an examination of the modified project documentation;